How an Uğur Klima Vent project runs, from survey to signature
From survey
to signature.
Five phases, one contractor carrying the responsibility through all of them.
Survey & load calculation
We walk the building, measure what is already there and calculate the real thermal and airflow load — not the figure the previous contractor assumed.
- Site survey
- Heat & airflow load
- Budget envelope
Design & documentation
Duct routing, plant selection and single-line diagrams drawn against the architecture, with the fire and electrical scopes coordinated in the same model.
- Layout drawings
- Plant schedule
- Coordination set
Supply & procurement
Equipment sourced against the schedule, delivered to programme, with sheet-metal and stainless fabrication produced in-house rather than subcontracted.
- Equipment supply
- Fabrication
- Delivery programme
Installation
Our own crews install the ductwork, plant, pipework and wiring — one accountable team in the ceiling void instead of four trades negotiating for the same 300mm.
- Ductwork & plant
- Pipework
- Power & controls
Commissioning & handover
Every system balanced to its design figures, tested, certified and handed over with the documentation an inspection will ask for.
- Airflow balancing
- Test certificates
- O&M manual